Details
Good practice dictates that hydronic central heating systems should be thoroughly cleaned and flushed before installing a new boiler, after which a chemical inhibitor should be added to ensure the system is protected from corrosion, scale and sludge build-up. These procedures should also be employed when major work is carried out on a system. A clean, protected system helps ensure that the heat generated by the boiler is transmitted efficiently into the house over the long term
- Maintain the design specification and energy efficiency
- Restore energy efficiency
- Inhibit the formation of scale and sludge
- Minimize corrosion of system metals
- Product code: 59480
Contents:
- 1 x Fernox Protector F1 17.6oz (500ml)
- 1 x Fernox Cleaner F3 17.6oz (500ml)
- 4 x Fernox pH Test Strips
- 1 x Fernox Protector Test Kit Instruction Leaflet